Brick - I know I left off with a 1/2 bricked house but here's some more. We had them halt brick when I realized how little stone would be on the front. They tried their best to get more hauled in but it just didn't work with our timing. Bummer. I'm mad at myself for not asking about this sooner. It will look nice regardless but just not what I envisioned. Oh well!
Scaffolding is up. |
Stone arrived for (minimal!) exterior ;) and fireplace. |
Hardwood floors have been hand scraped and stained! Scraped the wrong way but they still look great! We ordered against the grain and they did with. Things could be worse, right? This picture was taken through a filthy window since they locked the doors over the 24 hours of dry time.
Hardware - Sink and shower hardware went in! I went back and forth between oil rubbed bronze and chrome. I even ordered one, switched and then switched back. They love me at the Design Center. ;) Anyway, had I known they would goof and put our silver-specked quartz in the bathrooms, I would have chosen the alternative but this works too. Overall, we're happy!
Our sales guy is hoping for a Nov 15th close date but is certain we'll be in before Thanksgiving. I guess that's all I can ask for at this point. We are looking forward to going back by this evening to see brick all finished!
No comments:
Post a Comment